Environmental Impact
Phone number 402-680-5014 7756 Western Ave. Omaha NE 68114
The testing procedures that R Testing follows does not require “Overfilling” of the tank. Our testing protocol allows us to test tanks that have between 0 % and 91% tank capacity. Normal testing we would perfere to have 14% of the tank filled with product.
There is one mitigating factor that we consider before testing; it is the level of ground water around the tank.
During the pre-test questioning we will determine at that time if product will have to be increased in the tank to perform the test.
This is a safety requirement that protects you, us and the environment.